Wet bored piles; large diameter bored piles.
The project involves the construction of an overpass at the Bangna-Trat-Srinakarin intersection (Highway 3344), spanning 500 meters.

Wet bored piles | Boring process | Bored piles

Construction work: Wet bored piles, large diameter bored piles.     On Bangna-Trat Srinakarin Road (Route 3344), the two parallel overpasses are approximately 500-600 meters long. The piles are of two sizes, with depths of 50-60 meters (0.80 and 1.00 m diameter). The load-bearing piers are divided into 12 bases, each with 6 to 8 piles. Because some pile centers are less than 6 times the pile diameter apart, the drilling sequence requires alternating the pier bases in some locations.

SAFETY FIRST

Because the construction is taking place on a median strip with heavy traffic, the movement of pile-driving cranes and the transportation of construction equipment into casings using a vibrohammer must be carried out with extreme caution to ensure maximum safety.

บริการเป็นกันเองพร้อมราคาย่อมเยา

We undertake bored pile drilling projects of all sizes , including bored pile foundations for condominiums. Free site inspection and consultation services are available. Quality guaranteed at reasonable prices.

Bored pile.JPG
Bored piles | Reinforcement test procedure .jpg
Bored piles | Pile drilling rig .jpg
Bored piles | Bored pile drilling rig.JPG
Bored Piles | Procedure for Measuring Sand Quantity in Bored Piles.jpg
Bored piles | Work process.jpg

© 2026 บริษัท แสงฟ้าเข็มเจาะ จำกัด (Saengfah Borepile Co., Ltd.). All Rights Reserved.

 

bottom of page